TSP is providing architecture, interior design, mechanical and electrical engineering, and a portion of the structural engineering services for the project. A skywalk will connect the second level of the parking ramp to the terminal building, allowing passengers to cross over Jaycee Lane. Project benefits include an enhanced traveler experience and a greater focus on staff and passenger safety. Construction is scheduled for 2023, with the ramp slated to open in 2024. When the project is complete, the airport will have 3,865 total parking spots. The ramp, which will be located on the site of the airport’s current short-term parking lot, will include charging spaces for electric vehicles and an elevator for easy access. The first level will feature only short-term parking options, and levels two through four will be designated for long-term airport parking. The new, four-level ramp will add nearly 1,000 covered parking spaces that will be divided equally among the four levels. Construction is underway for a new parking ramp at the Sioux Falls Regional Airport to accommodate the increased demand that results from a growing regional population.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |